主机型号:0
发电机型号:0
发电机功率:0KW
出售2,329DWT双壳油轮。 船舶类型 油船(闪点>60℃) 安放龙骨日期2005年09月29日建造完工日期2006年08月07日改建日期 2013年09月05日。 船舶制造, 舟山市普陀区螺门船舶修造有限责任公司。 Flag:China。 Class:ZC。 船 体 部 分 总长 81.65 m 船长 75.70 m 满载水线长 77.91 船宽 12.00 m 型深 5.60 m 空载吃水 3.252 m 满载吃水 5.000 m 满载排水量 3616.400 t 空载排水量 1090.700 参考载货量 2329DWT 。 GRT1588/NRT895. 营运海区 A1+A2。 船体材料 钢质 ;甲板材料 钢质。 水密横舱壁数 10 双层底位置 #7-#116。 结构型式:纵横混合骨架式双壳结构‘补充加强结构。 货舱的数量8; 货舱盖型式 气密旋转式。 M/E:G6300ZCA*1-735KW/500rpm. 主机厂家:宁波中策。 货物泵:300m3/H x2台。 货物舱加装了加热盘管,适合运载120号和180号重油。 最近运载的油品种类是柴油和重油。 For sale 2,329 DWT double-hull oil tankers. Vessel type: Oil tanker (Flash point >60℃) The date of laying the keel was September 29, 2005. The completion date of construction was August 7, 2006. The renovation date was September 5, 2013. Shipbuilding, Zhoushan Putuo District Luomen Ship Repair and Construction Co., LTD. Flag: China. Class: ZC. The hull part Total length: 81.65 meters, length: 75.70 meters, full-load waterline length: 77.91 meters The ship is 12.00 meters wide, 5.60 meters deep and has an empty draft of 3.252 meters The full-load draft is 5,000 meters, the full-load displacement is 3,616.400 tons, and the no-load displacement is 1,090.700 tons The reference cargo capacity is 2,329 DWT. GRT1588/NRT895. Operating sea areas A1+A2. The hull material is steel. The deck material is steel. Watertight transverse bulkhead number 10, double-layer bottom position #7-#116. Structural type: Longitudinal and transverse mixed skeleton double-shell structure 'supplementary reinforcement structure. The number of cargo holds is 8. The cargo hold cover type is airtight rotary. M/E:G6300ZCA*1-735KW/500rpm. Host manufacturer: Ningbo Zhongce. Cargo pumps: two units of 300m ³ /H. The cargo hold has been equipped with heating coils, which are suitable for carrying heavy oil of grade 120 and 180. The types of oil products recently transported are diesel and heavy oil.

推荐企业
一问到底丨26兆瓦级海上风电机组完成安装 “大风车”有何大本领?
2025-09-01
2025-08-30
2025-08-29
2025-08-29
2025-08-28
2025-08-27
2025-08-26
我国深海研究再添“科考利器” 6000米级深海无人遥控潜水器“海琴”号完成首次深海试验
2025-08-25
2025-08-23
2025-08-20



