主机型号:2×1471kW 600r/m
发电机型号:2×1471kW 600r/m
发电机功率:KW
Classification CCS Built Year September 2012 Built place: China Length Overall 57.6m Length b.p 49.4m Breadth Moulded 12m Depth Moulded 5m Loaded draft 4.2m Maximum speed 12kn Bollard pull: 50t Endurance 3000n mile Main Engine 2×1471kW 600r/m Propellers 2 sets 12 * 30 meters after deck The ship is designed for offshore area B-supply / Tug job. With external supplies of fuel, fresh water

推荐企业
深挖111.52公里海岸线潜力 广东惠来以“蓝色引擎”激活海洋经济澎湃动能
2025-07-23
海洋经济释放“乘数效应”打造超大规模市场 “蓝色引擎”动能澎湃
2025-07-21
2025-07-17
2025-07-15
2025-07-14
百千万工程・徐闻实践 | 风从南海来!徐闻打造“绿能+枢纽”双引擎桥头堡
2025-07-10
台风“丹娜丝”今天下午到夜间将登陆浙江台州至福建宁德一带沿海
2025-07-08
2025-07-04
2025-07-03
2025-07-02



