-
建造: 2005,韩国
尺寸:L/B/D: 36.58 / 10.0 / 4.5 M
总吨: 316T
主机:YANMAR Z280L-GL, 2000PS X 740RPM X 2 SETS
辅机: YANMAR 6AL-T2, 225KVA + YANMAR 6KHL-STN 200KVA
船员: 8P
系缆拖力: 42.52T (NOV. 17, 2012)
LAST/NEXT SS: JUNE 27, 2011 / JUNE 26, 2016
LAST 2ND INTERMEDIATE SURY: SEPT. 27, 2013
NAV/COMMUNICATION: RADAR(JMA-5106), GPS PLOTTER(NAVIS 3100),
TWO VHFS (STR-680 & STR-6000) ETC.
M/E RUNNING HOUR: 2,834 HOURS SINCE MAY 2005.
<br/>M/E: YANMAR Z280L-GL, 2000PS X 740RPM X 2 SETS
A/E: YANMAR 6AL-T2, 225KVA + YANMAR 6KHL-STN 200KVA
-
载重吨约为1998吨。双底双壳。<br/>1998 dwt
-built: 1987 japan
-GRT : 698 Tons
-LOA/LBP/B/D : 71.99/68.00/12.0/5.3 Meters
-Tanks : 10 - 2,294 M3 / Coiled /Double Hull,
Double Bottom
-Pumps : Screw type, 600M3/HR x 2 Sets
-M/E : Hanshin 6EL30, 1800PS/300RPM
-Speed : 12.0 Knots in Laden on 3.7T IFO380
-A/E : Showa 220PS/1200RPM + Anima 50PS/1800RPM
-Shaft Generator : Fitted
-Boiler : Takuma, 8.5KG, Max 230C
-High level Alarm : Fitted
-E/R CO2, Air Foam : Fitted
-F.O Tank : 72.03 M3
-Complements : 9 Crew
-Propeller : CPP
-Hull/Bottom : Double/Double
-Cargo Pump : Screw Type 600CBM x 7.0 KGF Cm2/D.P.
x 2 Set
-Last special Survey : March 16, 2012.
2nd Intermediate Survey : March 16, 2013 (Passed,
Engine overhauled)
-
双底双壳,载重吨约为1998吨。<br/>1998 dwt
-built: 1987 japan
-GRT : 698 Tons
-LOA/LBP/B/D : 71.99/68.00/12.0/5.3 Meters
-Tanks : 10 - 2,294 M3 / Coiled /Double Hull,
Double Bottom
-Pumps : Screw type, 600M3/HR x 2 Sets
-M/E : Hanshin 6EL30, 1800PS/300RPM
-Speed : 12.0 Knots in Laden on 3.7T IFO380
-A/E : Showa 220PS/1200RPM + Anima 50PS/1800RPM
-Shaft Generator : Fitted
-Boiler : Takuma, 8.5KG, Max 230C
-High level Alarm : Fitted
-E/R CO2, Air Foam : Fitted
-F.O Tank : 72.03 M3
-Complements : 9 Crew
-Propeller : CPP
-Hull/Bottom : Double/Double
-Cargo Pump : Screw Type 600CBM x 7.0 KGF Cm2/D.P.
x 2 Set
-Last special Survey : March 16, 2012.
2nd Intermediate Survey : March 16, 2013 (Passed,
Engine overhauled)
-
双底双壳。载重吨约为1998吨。<br/>1998 dwt
-built: 1987 japan
-GRT : 698 Tons
-LOA/LBP/B/D : 71.99/68.00/12.0/5.3 Meters
-Tanks : 10 - 2,294 M3 / Coiled /Double Hull, Double Bottom
-Pumps : Screw type, 600M3/HR x 2 Sets
-M/E : Hanshin 6EL30, 1800PS/300RPM
-Speed : 12.0 Knots in Laden on 3.7T IFO380
-A/E : Showa 220PS/1200RPM + Anima 50PS/1800RPM
-Shaft Generator : Fitted
-Boiler : Takuma, 8.5KG, Max 230C
-High level Alarm : Fitted
-E/R CO2, Air Foam : Fitted
-F.O Tank : 72.03 M3
-Complements : 9 Crew
-Propeller : CPP
-Hull/Bottom : Double/Double
-Cargo Pump : Screw Type 600CBM x 7.0 KGF Cm2/D.P. x 2 Set
-Last special Survey : March 16, 2012.
2nd Intermediate Survey : March 16, 2013 (Passed, Engine overhauled)
-
双底双壳。载重吨约为1998吨。<br/>1998 dwt
-built: 1987 japan
-GRT : 698 Tons
-LOA/LBP/B/D : 71.99/68.00/12.0/5.3 Meters
-Tanks : 10 - 2,294 M3 / Coiled /Double Hull,
Double Bottom
-Pumps : Screw type, 600M3/HR x 2 Sets
-M/E : Hanshin 6EL30, 1800PS/300RPM
-Speed : 12.0 Knots in Laden on 3.7T IFO380
-A/E : Showa 220PS/1200RPM + Anima 50PS/1800RPM
-Shaft Generator : Fitted
-Boiler : Takuma, 8.5KG, Max 230C
-High level Alarm : Fitted
-E/R CO2, Air Foam : Fitted
-F.O Tank : 72.03 M3
-Complements : 9 Crew
-Propeller : CPP
-Hull/Bottom : Double/Double
-Cargo Pump : Screw Type 600CBM x 7.0 KGF Cm2/D.P.
x 2 Set
-Last special Survey : March 16, 2012.
2nd Intermediate Survey : March 16, 2013 (Passed,
Engine overhauled)
-
双底双壳。载重吨约为1998吨。<br/>1998 dwt
-built: 1987 japan
-GRT : 698 Tons
-LOA/LBP/B/D : 71.99/68.00/12.0/5.3 Meters
-Tanks : 10 - 2,294 M3 / Coiled /Double Hull,
Double Bottom
-Pumps : Screw type, 600M3/HR x 2 Sets
-M/E : Hanshin 6EL30, 1800PS/300RPM
-Speed : 12.0 Knots in Laden on 3.7T IFO380
-A/E : Showa 220PS/1200RPM + Anima 50PS/1800RPM
-Shaft Generator : Fitted
-Boiler : Takuma, 8.5KG, Max 230C
-High level Alarm : Fitted
-E/R CO2, Air Foam : Fitted
-F.O Tank : 72.03 M3
-Complements : 9 Crew
-Propeller : CPP
-Hull/Bottom : Double/Double
-Cargo Pump : Screw Type 600CBM x 7.0 KGF Cm2/D.P.
x 2 Set
-Last special Survey : March 16, 2012.
2nd Intermediate Survey : March 16, 2013 (Passed,
Engine overhauled)
-
<br/>现货,有DNV 证书!
01 Main Engine 1 set
WARTSILA 8L32
Power: 4000 kW at 750 rpm; 8 cylinders in
line; D=320 mm; S=400 mm;
- Turbocharger: ABB PPL69 A30; No. HT 466 957
- Engine Monitoring and Control System:
WECS 2000
- Driven pumps:
- Lub. Oil
- HT- water
- LT – water
- Electrician Motors:
- Lub. Oil Pump; 8 kW; 3430 rpm
- Turning Gear; 2,5 kW; 1720 rpm;
02 Gear Box 1 set.
03 Controllable Pitch Propeller 1 set.
04 Tail Shaft (Without intermediate shaft and
intermediate bearing) 1 ps
05 Deadwood Pipe (Bearing with Seal) 1 set.
06 Shaft Generator 1 pc.
07 Flexible Coupling for Main Engine (Without
Hub) 1 pc.
08 Flexible Coupling for PTO 1 pc.
09 Circulation Pump (MDF) Diesel Fuel Oil
Circulating Pump. 1 pc.
10 Safety Filter 1 pc.
11 Stand-by Pump (Circ. Lub. Oil Pump) 1 pc.
12 Air Filter (Starting Air) 1 pc.
13 Starting Air Vessels 2 psc.
14 Preheating Unit(with circulating pump) 1 set
15 HT Stand-by Pump 1 pc.
16 LT Stand-by Pump 1 pc.
17 Central Cooler 2 pcs.
18 Exhaust Gas Silencer With Spark Arrestor 1 pc.
19 Starters For Electrician Motors
20 Booster Unit (Fuel Oil Unit) 1 set.
21.Pump Unit (conceivably for CPP) 3 set.