-
FOR SALE: 9,900 DWT Double-Bottom Single-Skin Bulk/General Cargo Vessel
•Built/Delivery Date: 2008
•Shipyard: Jiangsu, China
•Loaded Draft: 7.45 m
•Light Draft: 4.325 m
•Loaded Displacement: 13,055.300 T
•Light Displacement: 2,931.400 T
•Dimensions (LxBxD): 122.98 m * 18.5 m * 9.7 m
•Total Grain Capacity: 12,800.3 m³
•Gross Tonnage: 6,223 T
•Net Tonnage: 3,485 T
•Cargo Holds/Hatches: 2 Holds / 2 Hatches
•Hatch Covers: Steel sealed type / Roll-on-roll-off (sliding) for opening
•Main Engine: 5L35MC-L3
•Main Engine Power/Speed: 2,750 kW / 178 rpm
•Main Engine Manufacturer: Yichang Diesel Engine
•Generators: <span>120</span> kW x 3 units + 64 kW x 1 unit
•Fuel Consumption: Heavy Fuel Oil (HFO) 6 T/day; Marine Diesel Oil (MDO) 0.25 T/day
•Main Engine Fuel: HFO 180 cSt
•Generator Fuel: MDO 0#
•Last Dry Dock/Special Survey (DD/SS): September 2023
•Next DD Due: September 2025
•Next SS Due: 2028
•Navigation Area: A1 + A2 (Coastal)
•Flag: China
•Class: Local Maritime Safety Administration (ZC)
•Lifeboats: Enclosed lifeboat, 1 x 17 persons
•Service Speed: 10 knots
-
For Sale: 2700 TEU Container Ship
Length overall abt.188.80 m
Length between perp abt.185.40m
Breadth moulded 32.20 m
Depth moulded 17.10m
Design draught (Td) 9.50m
Scantling draught (Ts) 11.50m
Deadweight at Ts abt.34,790t
Complement 26P+6 SuezCrew。
CARGO CAPACITY AND EQUIPMENT
Container on deck(13 row /7 tier) abt.1,733 TEU
Container in hold (11 row/6 tie) abt.960TEU
Container (8'6") total (SOAs visibility) abt.2,693TEU
Homo.14t/TEU at Ts abt.2,010 TEU
8ased on 100% Bunker, 86*,45%vCG)
Electric sockets for Reefer Containers :(5.0 kW/plug)
400 FEU(On Deck 360FEU/In Hold 40 FEU)
Hatch cavers Steel pontaon welded leible bearing pad
Stack load on deck 90/20ft,<span>120</span>/40fM
Panel weigh max.35t of each panel
Lashing pattern Intemailashingin general
Lashing bridge
stackloadin bald 30.5t4ach/204_404。
ENERGY EFFICENCY PARTICULARS
Service speed on CSR,at Td 18.0kn
(with 15% sea margin)
ME DFOC at CSR(Tier Ill mode) abt.43.3t/d
(LCV 42,700(MGO) kJ/kg
Rudder Semi balanced type
ESD S-Bow
Lighting LED type
Ballast pump El-motor driven, 2x 500m /h
-
For sale 65,000 DWT bulk carriers.
Flag PANAMA。
Class:IBS。
Year of Build 2025/10。
Place of Build CHINA.
Length O.A. 199.98m
Length W.L. 196.5m
Breadth 32.26m
Depth 18.9m
Draft 13.5m
DWT/Capacity 63500t/78500m³
Propulsion make MITSUBISHI
Propulsion type 6UEC50LSH-ECO-C2
Propulsion power 10680hps@108r/m
Crane 36t@29m
Generator 3 units
Type of generator 6DE-18
Power of generator 700kw/60hz
Emergency generator 1 unit
Type of emergency generator CCFJ<span>120</span>Y-YW-SDP
Power of emergency generator <span>120</span>kw/60hz
B.W. treatment HMT-2000 2000m³/h
Oil Tank 1500m³
F.W.Tank 400m³
Complements 25P
Lifebuoy 1unit
Liferaft 4 unit @20 person
Lifejacket 60 person
VESSEL LOCATION
China
-
37,500 DWT (2,206 TEU) container ships for sale
Vessel type: Container ship。
Built : December/2026。
Shipyard: Yizheng Shippbuilding
Flag:CHina。
Class: CCS
MAIN PARTICULARS(船舶主要特征)
TEU 容量(capacity): 2206。
LOA(总长): 184.80m
LBP(两柱间长): 178.80m
Beam(船宽): 30.50m
Depth moulded(型深): 14.95m
GT/NT(总吨/净吨):23989/12632
Deadweight : 37500MT about 10.40m Design draft/TPC (载重吨:10.10米设计吃水吨位37500吨)
Lightweight(空船重量):to be confirmed(待确认)
Height fm keel to highest point on the ship about45.95m(龙骨以上最大高度约为45.95米)
Height from summer load-line/ draft to highest point on the ship: 35.55 m(夏季满载吃水线以上最大高度:35.55米)
Number of holds(货舱数): 5 Holds
Number of hatches(舱口数): 5 Hatches
CONTAINER CAPACITIES:
集装箱容量: 20'(标准20尺货柜) 40'(40尺货柜)
In Hold(舱内): 942 units or units
On Deck (甲板上): 1264 units or units
Total(总): 2206 units or units
Reefer Plugs(冷藏集装箱插头):
On Deck(甲板上): <span>120</span> units @11kw/7.5KW - 380V each
HOMOGENOUS LOADING CAPACITIES(均匀负载能力):
8.0mt per teu: about teus (8吨/标准集装箱: 个)
10.0mt per teu: about teus (10吨/标准集装箱: 个)
14 tm per teu : about teus (14吨/标准集装箱: 个)
MAXIMUM STACK WEIGHTS(最大堆叠重量)
Stack Weight In Holds) (舱内) On Deck(甲板上)
20' mts(吨) mts(吨)
40' mts(吨) mts(吨)
TANK CAPACITIES (about 100% capacity) ( 水、油舱容(约100%容量))
FO(燃料油): 746.35m3(立方米)
LSFO(低硫燃料油): 117.18m3(立方米)
DO(低硫轻柴油): 43.9m3 (立方米)
Fresh water(淡水): 213.1m3 (立方米)
Urea solution tank(尿素溶液舱):31.14m3(立方米)
Ballast Water(压舱水): 11857.46m3(立方米)
MACHINERY (机器):
Main Engine (主机):
Maker (制造商): Guangchai Mitsubishi (广柴三菱)
Model (型号): 6UEC42LSH-Eco-D3
Tier( 等级): Ⅲ
MCR(最大持续功率): 7560KW x118 rpm MCR(转速)
Auxiliary Engines (辅机):3 units(台) :
Maker(制造商): Yangzhou Taikang Power Technology Co., Ltd(扬州市泰康动力科技有限公司)
Model(型号): CCFJ500J ( 1000 rpm)500KW
Shaft generator set(轴带发电机组) :1 units(台) :
Maker(制造商):
Model(型号): 500kW
Emergency generator(应急发电机):
1 uits(台)
Maker(制造商): Yangzhou Taikang Power Technology Co., Ltd(扬州市泰康动力科技有限公司)
Model(型号): CCFJ200Y (200kW )at 1500 rpm
Bow Thruster((船)艏侧推器): NIL(无)
SPEED AND CONSUMPTION(速度和油耗)
At Sea(海上):
about 13.5 knots on about 18.4 mt FO for main engine
about 13 knots on about 16.4 mt FO for main engine
about 12.5 knots on about 14.4 mt FO for main engine
about 12 knots on about 12.8mt FO for main engine
about 11 knots on about 10.2 mt FO for main engine
plus about 2.0 mt LSDO for auxiliaries(remarks:1 AE(500KW) Running) (此外约 2.0吨低硫柴油用于辅机(备注:1 个辅机(500KW)运行))
about 4.25 mt LSDO for auxiliaries (if reefers are in used)(Remarks: two AE running) (约4.25吨低硫柴油用于辅机(如果使用冷藏集装箱)(备注:2个辅机运行))
About 2.0 mt LSDO daily for auxiliaries use for heating water/fuel oil(remarks:1 AE(500KW) Running)(辅机每天消耗约 2.0吨低硫柴油用于加热水/燃料油(备注:1个辅机(500KW)运行))
In Port(在港口):
about 2.0 mt LSDO for auxiliaries (excluding consumption for reefer plugs, if used)(辅机每日消耗约2.0吨低硫柴油(不包含如果使用冷藏集装箱插头的消耗))
Vessel to be bunkered with bunkers complying with following specs(船舶加注的燃油应符合以下规格):
1.VLSFO RM / ULSFO RM in strict accordance with ISO 8217:2017 and in accordance with ISO/PAS 23263:2019.(超低硫燃料油/极低硫燃料油(船用残渣燃料油)严格符合ISO 8217:2017 标准,符合ISO/PAS 23263:2019标准)
2.Can burn according to ISO 8217:2010(E) and statutory requirements if required.(如被要求,可以根据 ISO 8217:2010(E) 和法定要求进行燃烧。)
3. ULSFO DM in strict accordance with ISO 8217:2017 and in accordance with ISO/PAS 23263:2019.Can burn according to 8217:2010(E) and statutory requirements if required.(极低硫燃料油(馏分燃料油)严格符合 ISO 8217:2017标准,符合ISO/PAS 23263:2019标准。如被要求,可以根据8217:2010(E) 标准和法定要求进行燃烧。)
4.Should the above mentioned fuels not be available, any alternative supply is always subject to Owners' prior approval.(如果没有上述燃油,任何替代供应均须事先获得船东的批准。)
5.However, notwithstanding the aforesaid, bunker specification always to meet ISO fuel standard 8217:2017 (and as amended from time to time).(尽管有上述规定,燃油规格始终符合 ISO 燃料标准 8217:2017(以及不时修订)。)
Vessel's Endurance(船舶续航能力): about <span>120</span>00nautical miles at speed13knots(航速13.5节时,约9000海里)
Delivery from shipyard(交船时间): 2024.10
vessel is using software name(船舶使用软件的名称):
........... for stowage planning & stability calculations(用于配载规划和稳定性计算): to be confirmed(待确认)
Vessel is fitted with Ballast Water Management System.(船舶装有压载水管理系统)
The browser in the computer used on board to be Microsoft Windows 8,Internet Explorer 8, or later version (in order to use the vessel report system)(船上使用的电脑浏览器为Internet Explorer 8,操作系统为Microsoft Windows 8或更高版本(以便使用船舶报告系统))
Vessel is ready to receive shore power connecting to shore connection directly .(船舶已准备好接收岸电,直接连接到岸电)
Vessel is fully fitted with cell-guides in cargo holds.(船舶在全部货舱中配备了格式导向装置
-
For Sale: 5,500 DWT General Cargo Ship。
Class:OMCS。
Flag:BeLiZe.
建造年份和地点BUILT YEAR &PLACE : DEC. 2012 YIZHENG SHIERWEI SHIPYARD
排水量DISPLACEMENT: 6715.2MT
载重吨DEADWEIGT: 5328.4MT
空船重量LIGHTSHIP : 1386.8 MT
夏季吃水DRAFT @SUMMER : 5.85M 淡水宽限ALLOWANCE FOR FRESH WATER: 130MM
每厘米吃水吨数TPC APPROX. SUMMER DRAFT: 12.9MT
总吨/净吨GROSS TONNAGE/NET TONNAGE: 2998/1746
船长/船宽/船深LOA/BEAM/DEPTH: 96.9/15.8/7.4M
垂线间长/型宽/型深LBP/MOULDED BREADTH/MOULDED DEPTH: 89.8/15.8/7.4M
舱口数量NUMBER OF HOLDS:2NOS 舱容HOLDS CAPACITIES: 3377/3447CUB.M 总仓容TOTAL CAPACITY:6824 CUB.M
舱盖类型TYPE OF HATCHCOVER:钢制风雨密 翻滚式舱口盖 rolling and tipping type hatch cover
舱口尺寸HOLDS DIMENSION: H1/25.0×9.45M ;H2/26.9×9.45M
舱底尺寸TANKTOP DIMENSION : H1/32.64×13.26M ;H2/32.0×13.26M
舱深DEPTH OF HOLD:H1/7.82M;H2/7.82M舱口高度HEIGHT OF HATCHCOAMING:1.40M
压载舱数量及舱容BALLAST TANK CAPACITIES: 21NOS/<span>120</span>0.6CUB.M
航速及油耗SPD/CONSUMPTION:满载/空载FULL LOADED/BALLAST:10.5/11KTS IFO 180 5.0MT/D;AUX/E MGO 0.4MT/D
在港IN PORT: AUX/E MGO 0.4MT/D
主机功率 MAIN ENGINE POWER:1765KW。
-
出售1400方漏底泥驳船 价格-260W
航区:沿海
建造国:中国。江苏
完工时间:1990.10(无年限工程船)
总吨:996
净吨:557
船籍港:北海
船级:ZC
总长:62.8
船宽:12
型深:4.8
主机功率:<span>120</span>0KW
联络13823383044
-
出售新造10000马力拖轮
船级社:CCS
总长60.86m/船宽16m/型深5.5m
主机品牌:青岛淄柴博洋8N280ZLC-15
主机功率:3530KW两台
备注:已吉水 系柱拖力<span>120</span>T;航速12.5KN;艏侧推。含3000万增值税发票
没有DP,没有灰罐
联络 13823383044
-
375 X <span>120</span> X 20FT (114.3X36.6X6.1m)
出生日期:2013
建造商中国
等级:CCS有效
载重吨位:12,551吨
GT: 6,844
NT: 2,053
船体长度:114.3米
横梁:36.6米
深度:6.1米
甲板载量:25吨/平方米
压载水舱:15,642立方米
燃油储罐:706立方米
自充气式:3台,每台每小时可处理2000立方米,扬程15米
储罐液位测量:NORDIC,中央安装板附带远程PDU面板 PC 17''触屏
远程阀门控制:诺德克牌、电动驱动执行器阀门
锚碇:1个 X 3,060kg Baldt无桩锚碇
救援绞车:1台 10T
绞盘:4个×10T
Cherry13823383044
-
出售:3500吨双壳双机货船
建造年份:2011年
建造地址:China 中国 浙江
航 区:沿海
船级社:ZC
船舶尺寸:
•总长:79.30m
•船宽:15.20m
•型深:5.60m
•满载吃水:4.50m
主机型号:潍柴X6170
总功率:353kW(r/min<span>120</span>0)x2台
货舱数量:1舱
货舱结构:双底/双壳/
舱 盖:行车吊离式
总吨:2150/净吨:1180/
船况说明:刚刚已经保养好,适合国内外用途。
欢迎来自国内外客户咨询
(Ship broker)郭经理
Tel:+86 136 8509 6458
E-mail:1371380401@qq.com
【福安鸿诚船舶贸易有限公司】
专业经营二手船舶买卖交易、船舶评估、船舶修造、船舶买卖进出口交易一站式服务,让您的船舶交易无忧。
-
For Sale: Multipurpose Vessel - 27216 DWT (1387 TEU)
•DWT: 27,216
•TEU: 1,387
•Built: 2014
•Shipyard: Taizhou, China
•Flag: Singapore
•Classification Society: Bureau Veritas (BV)
•Dimensions:
•Length Overall: 170.7 m
•Breadth: 27.40 m
•Depth: 14.30 m
•Draft (Loaded): 10.50 m
•Trading Area: Unlimited
•Number of Hatches/Holds: 5
•Hatch Covers: Hydraulic
•Main Engine: DMD MAN B&W 6S50MC-C 8.2 TIER II
•Main Engine Output: 8,250 kW
•Gross Tonnage / Net Tonnage: 20,886 / 11,064
Container Capacity Maximum 40ft x 8'x 8'6", ISO size
On deck/hatch : 33 TEU+376FEU-Total equivalent to785 TEU
In hold : 18 TEU +292FEU-Total equivalent to 602 TEU
Total: 51TEU + 668FEU -Total equivalent to 1387TEU
Two tiers of high cube can be loaded in holds without killing slots.
Homogenous Loading at Design and Scantling Draught
Homogenous Loading TEU Weight
Homoload[16 Tons 975 15600
Homoload [14 Tons] 1080 15<span>120</span>
Homoload [12 Tons 1217 14604
Homoload[11 Tons 1239 13629
Remarks: The above loadability is subject to following
1. IMO and Panama Canal Visibility requirements
2. GM reserve and prevailing sea / weather conditions
3.
Standard practice of container loading
4.Hull stresses and bending movements
5. Container securing Manual and Cargo Securing manual
6.Master's discretion based on vessel’s safety and voyage conditions
THE LOADABLE NUMBER OF CONTAINERS, SHALL ALWAYS BE LIMITED TO
CONTAINER SECURING SYSTEM AND THE VISIBILITY REQUIREMENTS.
NO LASHING BRIDGES PROVIDED
Regardless of the maximum designed stack weight for the hatch covers, the maximum
stack weight of containers exposed to weather may be change in accordance with the
calculation result of Class Rule. Trim and Stability calculations based on the following
Criteria and Conditions
● IMO A749 (18)
IMO SOLAS I-I, Part B-1 Subdivision and Damage Stability of Cargo Ships
Transverse metacentric height after free surface correction (GoM) not less than
● 0.50 m
Trim by bow not exceed 2 m at any condition
•Trim by stern not exceed 2 m in all operations (excluding ballast condition)
Fuel oil shall not be used as ballast function in all operation
CARGO HANDLING GEAR
4 cargo deck cranes have been provided on board
MACGREGOR CRANES, SWEDEN AB
NO.1:GL4027/MLC/2637-2,40T/27m,26T/37m,1 SET
NO.2A&2B: TGL4522/MLC/3031-2,45T/22m,30T/31m, 2SET
NO.3: GLH9027/MLC/6037-3,90T/27m,60T/37m,1SET
Page 3 of 6
-
出售4000、6000/8000/10000/<span>120</span>00/15000吨自吸自卸沙船,证书齐全
-
MV.3659DWT双底双壳
Ship's Type:甲板驳船。
Flag:中国。
Class:ZC 中国。
满载吃水:3.70M。
空载吃水:2.923M。
满载排水量:5103.500MT。
空载排水量:1311.34MT。
G.R.T:2248MT。
N.R.T:1258MT。
船舶尺寸:Loa97.30m/Lbp84.25m/Breadth18.8m/Depth4.88m。
甲板长度:长度65Mx宽度18.8M=1222M2。
有四根锚泊定位。
Type of Main Engine:YC6CL510L-C20。
Main engine power:374KW/750rpmX2台=748KW。
主机实际功率;<span>120</span>0HPx2台=2400HP。
Trafic Clearance:沿海。
When Built:2021年4月15日。
Where Built:中国江苏。
交易地点:in 中国。
航速:9节。
-
多 功 能:港内顶靠/消防
航 区:沿海
船 级:ZC
建 造 厂:中国浙江
建造时间:2020年
船舶尺寸:总长/船宽/型深:37.55m/9.95m/4.90m
满载吃水:3.80m
总吨/净吨:395/98
主机厂家:青岛淄柴博洋8250/1765KW*2台
发 电 机:<span>120</span>KW 2台
推 进 器:驱动直径24000mm Cu3 全回转Z型推进器
消防水炮:一台 型号CXB250-200/ 排量600立方米/每小时 扬程130米
换证检验:2030年
财富热线:18028745546 13823383044 (微信同号)
-
出售875TEU近海集装箱船。
Flag:China。
Class:CCS。
建造日期:2015年。
建造地点:China。
满载吃水:8.00m。
空载吃水:5.198m。
G.R.T:11305T。
N.R.T:6330T。
空船重量:6010T。
货舱/舱盖:7H/吊离式。
舱口尺寸:12.95mX17.7m*6;15.25mx18.72m*1。
总长154.81m*型宽22.2m*型深11.2m。
舱里:398TEU/甲板477TEU/冷插:24TEU。
主机型号:6PC2-6L*1。
主机功率:2970KW/500rpm。
辅机:Tfxw-355m6-h/250kw*3+<span>120</span>kw*1。
油耗:重油9T/24H;轻油0.5T-0.7T/24H;机油45KG/24H。
Speed:12kts。
许可通航区域:A1+A2。
-
近海航区,大平头
主机:350千瓦两台
最低配员三个
适合海上风电运维
1336<span>120</span>8212
-
主机73千瓦,实际200马力
1336<span>120</span>8212
低价出售
-
主机玉柴760马力两台,
大平头适合风电
1336<span>120</span>8212
-
求购 内贸散货
5000总吨以上
7500-<span>120</span>00吨载重的船
广柴主机
09年到12年
1000万以内
-
第一章 招标公告
日期:2026年1月24日
招标编号:CRCC-GHJ-SBZL-202601-005
一、招标条件
中国铁建港航局 六横大桥二期工程项目经理部锚艇租赁招标项目已由项目审批机关批准,招标人为中国铁建港航局集团有限公司六横大桥二期工程项目经理部,招标组织单位为中国铁建港航局集团有限公司。本项目招标人资金已落实,已具备招标条件,现进行公开招标。特邀请具备资质的、符合招标要求的供应商(以下简称投标人)参与招标。本项目招标全程采用线上组织,时长租赁计价的方式,评定分离的执行模式。
二、项目概况
招标工程地点:中国铁建港航局集团有限公司六横大桥二期工程项目经理部(浙江省宁波市);
工程概况:浙江省宁波舟山港六横公路大桥项目二期工程起自六横岛西南侧,干岩村外干岩南侧,项目起点桩号为 K0+000,设置干岩互通与孙干公路、外涨线连接,路线经小郭巨围垦区,在火烧山嘴入海,设置双屿门通航孔桥跨越双屿门水道,在佛渡岛登陆后设置佛渡互通,随后路线向西入海,设置青龙门通航孔桥跨越青龙门水道,在梅山岛登陆后,实施梅山互通的二期主线部分和舟山方向的两条匝道,路线终点桩号 K19+402,路线全长 18.782 公里。 全线共设主线桥梁约 17764m,其中特大桥约 16877m,包括积峙桥(全长 5486.391m,预制 T 梁+组合梁)、双屿门通航孔桥(486+1768+628,双塔单跨吊钢箱梁悬索桥)和青龙门通航孔桥(119+231+756+756 +231+119,三塔双索面斜拉桥),大桥约 887m/2 座;设互通 2 处,匝道收费站1 处,主线收费站 1 处,管理中心 1 处、养护工区 1 处,停车区 1 处,交警和路政管理用房各 1 处、超限检查站 1 处以及必要的综合用房等设施。
设备主要施工内容:中国铁建港航局集团有限公司六横大桥二期工程项目经理部五工区墩身平台拆除及其他配套工程。
三、招标范围及内容
本招标项目划分为2个包件,潜在投标人可以对某一包件或多个包件进行投标,但必须对该包件中对应所有型号及费用组成进行报价。
本次招标的设备规格型号、数量、技术参数要求以及包件号等详见招标公告附件。
四、投标人资格要求
1.在中华人民共和国境内注册、具有独立法人资格、具有依法纳税记录的法人或组织,能够独立承担民事责任;营业范围应与对应船机设备租赁业务相关。
2.供应商应在铁建云租平台进行注册并通过审核。
3.具备国家有关部门、行业要求必须取得的经营许可、安全许可,特殊行业要具有国家有关部门颁发的资质证书。
4.国家工商行政管理局批准的营业执照,壹佰万元(¥100万元)及以上注册资本金。
5.投标人船机设备质量稳定,供应信誉良好。投标人必须具有良好的社会信誉,近三年内未发生重大质量问题、无重大法律纠纷、未被人民法院列入失信被执行人名单,未被市场监督管理部门列入经营异常名录或严重违法失信名单;最近三年内没有与骗取合同有关的行为和严重违约行为;财产未被接管或冻结,企业未处于禁止或取消投标状态;拟定入围供应商不存在被行业主管部门处罚,且目前在处罚有效期内的情况。
6.未在铁建系统警示名录内。
7.不接受联合体、挂靠性质的单位进行投标。
8.必须对投标文件所提供的全部资料的真实性承担法律责任。
*以上要求投标人必须同时满足,提供的所有资质文件必须真实有效,且与投标人主体一致,如需年检的,请确保提供的文件已年检合格。
五、投标人资格审查方式及审查主要资料
1.本项目采用资格后审。
2.资格审查材料主要资料包括:营业执照;合格的资质条件;应当具备的行政许可证书;相应的船机设备、管理人员和操作人员;良好的经营和财务状况;与目标任务类似的经营业绩;无不良社会信誉记录;依法纳税、社保完整。(投标人需自行提供加盖公章证明材料)
3.失信记录及处罚情况等请登录以下网站查询:
国家企业信用信息公示系统(http://www.gsxt.gov.cn/)
中国执行信息公开网(http://zxgk.court.gov.cn/)
“信用中国”官方网站(http://www.creditchina.gov.cn/)
六、报名投标须知
招投标流程图:招标组织单位在铁建云租平台发布招标公告→供应商在铁建云租平台注册认证→铁建云租平台审核认证资料→供应商在铁建云租平台报名登记→供应商缴纳招标文件费用并上传加盖公章的授权委托书和购买记录表扫描件、付款凭证→招标组织机构确认缴费状态→供应商下载招标文件→供应商提交投标文件→招标组织机构公布报价及组织评审→招标组织机构在铁建云租平台发布入围供应商名录。
1.发布公告和澄清补遗的媒介
(1)本次招标公告和澄清补遗在中国铁建云租平台(https://www.crcccl.com/)发布。(如船舶类同时在航运在线(https://www.sol.com.cn/)和天天船舶(http://www.ttship.com/index.html)网站发布)
(2)招标安排如有变化,招标组织方将通过铁建云租平台发布通知或电话告知。
2.投标人报名及获取招标文件
(1)报名方式: 网上报名(https://www.crcccl.com/)。成功注册认证铁建云租平台后的供应商点击招标公告后进行响应,对应拟投包件进行登记即视为报名。注意:报名时请用已通过铁建云租平台认证,拟参与投标的主体公司下授权的账号报名,登记时留存准确的本项目被授权人(系统操作人)及手机号(公布报价前可修改),关于该项目的所有短信通知均将发送至该登记电话及电话联系,报名登记同时要设置投标文件解密密码(公布报价前可修改)。
操作流程:①投标人在铁建云租平台(https://www.crcccl.com/)完成企业注册、认证及签章申请;②投标人用其授权账号登陆铁建云租平台(https://www.crcccl.com/)查找招标项目进行登记报名。(操作流程请联系铁建云租平台客服:400-630-6060)
(2)报名及招标文件购买时间:2026 年1月25日9时30分至2026年1月30日9时30分。
(3)招标文件获取方式:
本项目招标文件价格500元/份,售后不退(特别提示:此次招标文件价格500元包含本招标项目下所有包件号,如果投标人误缴或多缴费,不予退还)。招标文件费必须由投标人企业账户进行银行转账或电汇(不接受以个人名义电汇或其他公司名义代汇),并在备注中注明“XX公司(全称)购买中国铁建港航局集团有限公司六横大桥二期工程项目经理部锚艇租赁招标项目招标文件”。投标人向本公告指定的招标文件费用收取账户打款后在铁建云租平台上传打款凭证。经招标组织方通过线上核对打款凭证与线下收款记录后,投标人可在铁建云租平台内进行招标文件的下载。收款账户信息如下:
户名:中国铁建港航局集团有限公司
账号:99610100104300028796
开户行:交通银行北京西区支行
联行号:301100000<span>120</span>
六、招标投标文件的递交
递交截止时间:2026年2月14日9时30分。
递交方式:一包一投。经铁建云租平台加密上传(登记时设置),逾期上传的投标文件,组织机构不予受理。
如招标人有需求,被评为入围候选人的供应商应无偿提供纸质版投标文件,纸质版投标文件内容须与电子版文件内容完全一致。
七、公布报价时间及地点
公布报价时间:2026年2月14日9时30分起。
公布报价地点:在线会议组织,系统在线公布报价。
八、其他
1.新用户使用注意事项
请潜在投标人及时提前注册并认证铁建云租平台,确认达到参与投标条件(咨询铁建云租平台客服400-630-6060),报名成功后务必记住用户名,使用该用户名登录。
2.电子签章办理
办理及咨询电话400-630-6060,请合理安排时间及时办理。参与本项目投标无需办理电子签章。
3.公告内所述日期如有变动,组织机构将及时在铁建云租平台发布变更公告,并以短信通知(登记报名预留)。
九、联系方式
招标人:中国铁建港航局集团有限公司六横大桥二期工程项目经理部
地 址:浙江省舟山市普陀区六横镇022乡道长挑咀中国铁建港航局六横大桥二期工程项目经理部
联 系 人:李振
电 话:15541101927
电子邮件:1345380323@qq.com
招标组织单位:中国铁建港航局集团有限公司
联 系 人:张将伟
电 话:15657089658
电子邮件:577083145@qq.com
-
第一章 招标公告
日期:2026年1月24日
招标编号:CRCC-GHJ-SBZL-202601-004
一、招标条件
中国铁建港航局 六横大桥二期工程项目经理部150t全回转起重船租赁招标项目已由项目审批机关批准,招标人为中国铁建港航局集团有限公司六横大桥二期工程项目经理部,招标组织单位为中国铁建港航局集团有限公司。本项目招标人资金已落实,已具备招标条件,现进行公开招标。特邀请具备资质的、符合招标要求的供应商(以下简称投标人)参与招标。本项目招标全程采用线上组织,时长租赁计价的方式,评定分离的执行模式。
二、项目概况
招标工程地点:中国铁建港航局集团有限公司六横大桥二期工程项目经理部(浙江省宁波市)
工程概况:浙江省宁波舟山港六横公路大桥项目二期工程起自六横岛西南侧,干岩村外干岩南侧,项目起点桩号为 K0+000,设置干岩互通与孙干公路、外涨线连接,路线经小郭巨围垦区,在火烧山嘴入海,设置双屿门通航孔桥跨越双屿门水道,在佛渡岛登陆后设置佛渡互通,随后路线向西入海,设置青龙门通航孔桥跨越青龙门水道,在梅山岛登陆后,实施梅山互通的二期主线部分和舟山方向的两条匝道,路线终点桩号 K19+402,路线全长 18.782 公里。 全线共设主线桥梁约 17764m,其中特大桥约 16877m,包括积峙桥(全长 5486.391m,预制 T 梁+组合梁)、双屿门通航孔桥(486+1768+628,双塔单跨吊钢箱梁悬索桥)和青龙门通航孔桥(119+231+756+756 +231+119,三塔双索面斜拉桥),大桥约 887m/2 座;设互通 2 处,匝道收费站1 处,主线收费站 1 处,管理中心 1 处、养护工区 1 处,停车区 1 处,交警和路政管理用房各 1 处、超限检查站 1 处以及必要的综合用房等设施。
设备主要施工内容:中国铁建港航局集团有限公司六横大桥二期工程项目经理部五工区墩身平台拆除及其他配套工程。
三、招标范围及内容
本招标项目划分为1个包件,潜在投标人必须对该包件中对应所有型号及费用组成进行报价。
本次招标的设备规格型号、数量、技术参数要求以及包件号等详见招标公告附件。
四、投标人资格要求
1.在中华人民共和国境内注册、具有独立法人资格、具有依法纳税记录的法人或组织,能够独立承担民事责任;营业范围应与对应船机设备租赁业务相关。
2.供应商应在铁建云租平台进行注册并通过审核。
3.具备国家有关部门、行业要求必须取得的经营许可、安全许可,特殊行业要具有国家有关部门颁发的资质证书。
4.国家工商行政管理局批准的营业执照,壹佰万元(¥100万元)及以上注册资本金。
5.投标人船机设备质量稳定,供应信誉良好。投标人必须具有良好的社会信誉,近三年内未发生重大质量问题、无重大法律纠纷、未被人民法院列入失信被执行人名单,未被市场监督管理部门列入经营异常名录或严重违法失信名单;最近三年内没有与骗取合同有关的行为和严重违约行为;财产未被接管或冻结,企业未处于禁止或取消投标状态;拟定入围供应商不存在被行业主管部门处罚,且目前在处罚有效期内的情况。
6.未在铁建系统警示名录内。
7.不接受联合体、挂靠性质的单位进行投标。
8.必须对投标文件所提供的全部资料的真实性承担法律责任。
*以上要求投标人必须同时满足,提供的所有资质文件必须真实有效,且与投标人主体一致,如需年检的,请确保提供的文件已年检合格。
五、投标人资格审查方式及审查主要资料
1.本项目采用资格后审。
2.资格审查材料主要资料包括:营业执照;合格的资质条件;应当具备的行政许可证书;相应的船机设备、管理人员和操作人员;良好的经营和财务状况;与目标任务类似的经营业绩;无不良社会信誉记录;依法纳税、社保完整。(投标人需自行提供加盖公章证明材料)
3.失信记录及处罚情况等请登录以下网站查询:
国家企业信用信息公示系统(http://www.gsxt.gov.cn/)
中国执行信息公开网(http://zxgk.court.gov.cn/)
“信用中国”官方网站(http://www.creditchina.gov.cn/)
六、报名投标须知
招投标流程图:招标组织单位在铁建云租平台发布招标公告→供应商在铁建云租平台注册认证→铁建云租平台审核认证资料→供应商在铁建云租平台报名登记→供应商缴纳招标文件费用并上传加盖公章的授权委托书和购买记录表扫描件、付款凭证→招标组织机构确认缴费状态→供应商下载招标文件→供应商提交投标文件→招标组织机构公布报价及组织评审→招标组织机构在铁建云租平台发布入围供应商名录。
1.发布公告和澄清补遗的媒介
(1)本次招标公告在中国铁建云租平台(https://www.crcccl.com/)、(https://www.sol.com.cn/)航运在线、(http://www.ttship.com/index.html)天天船舶发布。
(2)招标安排如有变化,或进行澄清补遗,招标组织方将通过铁建云租平台发布通知或电话告知。
2.投标人报名及获取招标文件
(1)报名方式: 网上报名(https://www.crcccl.com/)。成功注册认证铁建云租平台后的供应商点击招标公告后进行响应,对应拟投包件进行登记即视为报名。注意:报名时请用已通过铁建云租平台认证,拟参与投标的主体公司下授权的账号报名,登记时留存准确的本项目被授权人(系统操作人)及手机号(公布报价前可修改),关于该项目的所有短信通知均将发送至该登记电话及电话联系,报名登记同时要设置投标文件解密密码(公布报价前可修改)。
操作流程:①投标人在铁建云租平台(https://www.crcccl.com/)完成企业注册、认证及签章申请;②投标人用其授权账号登陆铁建云租平台(https://www.crcccl.com/)查找招标项目进行登记报名。(操作流程请联系铁建云租平台客服:400-630-6060)
(2)报名时间:2026 年1月25日9时30分至2026年1月30日9时30分。
(3)招标文件购买时间:2026 年1月25日9时30分至2026年1月30日9时30分。
(4)招标文件获取方式:
本项目招标文件价格500元/份,售后不退(特别提示:此次招标文件价格500元包含本招标项目下包件号,如果投标人误缴或多缴费,不予退还)。招标文件费必须由投标人企业账户进行银行转账或电汇(不接受以个人名义电汇或其他公司名义代汇),并在备注中注明“XX公司(全称)购买中国铁建港航局集团有限公司六横大桥二期工程项目经理部150t全回转起重船租赁招标项目招标文件”。投标人向本公告指定的招标文件费用收取账户打款后在铁建云租平台上传打款凭证。经招标组织方通过线上核对打款凭证与线下收款记录后,投标人可在铁建云租平台内进行招标文件的下载。收款账户信息如下:
户名:中国铁建港航局集团有限公司
账号:99610100104300028796
开户行:交通银行北京西区支行
联行号:301100000<span>120</span>
六、招标投标文件的递交
递交截止时间:2026年2月14日9时30分。
递交方式:一包一投。经铁建云租平台加密上传(登记时设置),逾期上传的投标文件,组织机构不予受理。
如招标人有需求,被评为入围候选人的供应商应无偿提供纸质版投标文件,纸质版投标文件内容须与电子版文件内容完全一致。
七、公布报价时间及地点
公布报价时间:2026年2月14日9时30分起。
公布报价地点:在线会议组织,系统在线公布报价。
八、其他
1.新用户使用注意事项
请潜在投标人及时提前注册并认证铁建云租平台,确认达到参与投标条件(咨询铁建云租平台客服400-630-6060),报名成功后务必记住用户名,使用该用户名登录。
2.电子签章办理
办理及咨询电话400-630-6060,请合理安排时间及时办理。参与本项目投标无需办理电子签章。
3.公告内所述日期如有变动,组织机构将及时在铁建云租平台发布变更公告,并以短信通知(登记报名预留)。
九、联系方式
招标人:中国铁建港航局集团有限公司六横大桥二期工程项目经理部
地 址:浙江省舟山市普陀区六横镇022乡道长挑咀中国铁建港航局六横大桥二期工程项目经理部
联 系 人:李振
电 话:15541101927
电子邮件:1345380323@qq.com
招标组织单位:中国铁建港航局集团有限公司
联 系 人:张将伟
电 话:15657089658
电子邮件:577083145@qq.com